Flood Study by Numbers

In the last 6 months, CCC have made no less than 56 applications to the OPW for Section 50 consent. The applications relate to 3 different highway schemes and include the use of 4 different methods of estimating rainfall to calculate flows associated with 3 clear span river bridges, 12 large box culverts, 1 weir and 40 smaller box and pipe culverts. If you require a flood study for your development, we have 1 excellent team ready to assist you.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *